Monday 9 March 2020

Enemalta Scheduled Maintenance - Nadur 12-3-2020

On the 12-3-2020,  Enemalta plc will be having a scheduled Maintenance which may result in power suspension in Nadur between 8.30 am and 2.30 pm in the following streets: 

PJAZZA L- ARCIPRIET MARTIN CAMILLERI 
TRIQ MADRE GEMMA CAMILLERI 
TRIQ DAVID COCCO PALMERI 
TRIQ L- IMGARR 
TRIQ PAPA LJUN XIII 
TRIQ XANDRIKU

                                   Flashlight

No comments:

Post a Comment